CTNM50 Complete Set Rice Mill
Features:
- This machine is one of the newest serial complete set rice mill designed by our company, the daily capacity is 50 tons.
- It has simple and convenient operation mode, bigger and fluent elevator, efficient and wide de-stoner, balanced press and oilless husker, paddy separator with huge treatment capacity, and steady whitener with strong performance. These conditions ensure that this machine is situated in top situation for small and medium size. It indicates that it's the top choice model for small and medium rice processing plant in domestic at present based on comprehensive marking information.
- This machine can be formed serial products for supplying follow-up machines successfully to improve rice grade conveniently for users base on their requests.
Technical Parameters:
Euipment |
Power(kW) |
Total Power (kW) |
Rotary cleaning sieve TQLM100×2 |
0.75 |
0.75 |
SSuction type de-stoner TQSX85B |
0.75 |
0.75 |
Husker LT25 |
7.5 |
7.5 |
paddy separator MGCZ100X12C |
1.5 |
1.5 |
Vertical emery roller rice whitener MNSL21.5/21.5 |
37 |
37 |
Multi-rice grading sieve MMJP100×3 |
0.75 |
0.75 |
HORIZONTAL RICE POLISHER MPGH19x1 |
37 |
37 |
Auto packing machine DCS25 |
1.1 |
1.1 |
Elevator 20/15 |
0.75 |
5.25 |
Centrifugal blower for de-stoner and rice dust 50# |
5.5 |
5.5 |
Centrifugal blower for husker 45# |
5.5 |
5.5 |
Centrifugal blower whitener 6-30NO.6A |
5.5 |
5.5 |
Air lock DF9L |
1.1 |
3.3 |
Pre-Sales Service:
1. Inquiry and consulting support
2. Sample testing support
3. View our Factory
After-Sales Service:
1.pay the double air tickets, accommodation and food. Our technicists can help you in local place
2.According to the requirement of the buyer, our company sends engineers for installation and commissioning in buyer's site including the training of skills of buyer's workers on operation, maintenance, etc.
3.Supply the solutions for different farming environment.
4. For the damage caused by the users, our company provides the parts and accessories with cost price.
5. Our factory supplies the wearing parts with the cost price to clients.
Package&Shipping:
Products will be finished in 15-20 working days after payment. It depends on your order quantity. And the shipping time to the port is about 1-2 days